Welcome to another episode of the LNG Academy, this time on board the Avenir Aspiration LNG bunkering vessel and I am your captain.
This on site episode is brought to you by Avenir LNG. Avenir LNG is a fully integrated global energy company dedicated to small scale LNG customers and working to provide LNG supply solutions for off grade industry, power generation, marine bunkering and the transport industry. Thank you Avenir LNG for allowing me on board the Avenir Aspiration LNG bunkering vessel.
Behind me is the 2018 M/S Visby A200 metres long ferry with a capacity of over 1600 passengers and 500 cars. LNG bunkering is in progress right now.
Captain Irfan Satria
Welcome LNG Academy on board Avenir Aspirations.
Hello, I’m Irfan Satria, Master of Avenir Aspirations. I have experience working on board the ships since 2003. I was working at the LPG and LNG business and I’m joining Avenir since 2022. So at this moment our aspirations, we are doing bunkering business supplying LNG to ferries. At this very moment, we are doing bunkering operations, supplying LNG to M/S in Scotland and we have carried out two bunkering operations for today. This ship is operating mostly in the Baltic area. So we were loading at the Glypeda, discharging at Trelleborg and also at Frisbee.
As an LNG bunkering vessel we supply LNG to ferries, passengers, vessels.
Prior we do the bunkering, we prepare the ships, we prepare the lines to be cooled down before we do the discharging. And then at the anchorage we need to prepare our pneumatic rubber fenders. These fenders to be deployed on the ship sites and then to be lowered by our friend. These fenders to make sure that when we are coming alongside the ships are protected to avoid if there is any contact. So when the ships well alongside the crew will be start to connecting the cargo hooses.
After we connect the cargo hose, we connect also the ESD system, we connect also the PERC system in order for the safety operations. If there is in case of any leakage, if in case of the ships needs to be cast off, it can be disconnected, the hose can be disconnected. Once the hose is connected, we pressurise the cargo hose with the nitrogens in order to check if there is any leakage on the connection of the hose and also on our pipeline at the manifold. Once we reach the pressure for the pressure testing both side confirm there is no leaking, then we can lower down the pressure and then we will do the ESD test from both sides.
This test is to make sure that in case of emergency, we can activate our emergency shutdowns and then all the valves and all the cargo equipment on both the ships will be shut down. This is to make sure that there is no excessive liquids when there is a leaking.
Once we carry out the ESD from both sides, we reset the systems, we start cooling down the cargo hose for about 20 to 30 minutes. Once the cargo hose are cooled down properly cooled down and the hose are filled with liquid, then we can start to ramp up rising up the discharging rate up to the maximum. Once almost when the cargo quantity to be discharged are about to be reached, we ramp down the discharging rate and then when it’s reached the quantity, we stop the cargo operations.
The next steps that we have to clear the line, we have to push the line by with nitrogens, so we have to make sure that there will be no remaining liquids in the cargo hoses before we do the disconnections. So once the cargo hose are cleared from the liquids and also gas free, then we can start to do the disconnection of the cargo hose. And then when we are clear, we disconnect the cargo hose and then we put the cargo hose back to the positions.
This ship is operating in the Baltic Sea. When we’re supplying our LNG, we, the port that we visit are Fisbee and Traleborg. Here at Fisbee, we as I certified with the pilot exempt certificates, so I don’t need, I don’t need the pilot to assist me and since the ship is equipped with azipods and the bow thrusters, I can maneuver the ships very easy then we are not required any tuck assist during the maneuvering.
Mehdy Touil
One of the key steps in ensuring safe LNG bunkering is verifying that the supplying vessel or facility and the receiving vessel are compatible.
Because of the complexity of LNG as a cryogenic liquid, it is more important to confirm compatibility than for other marine fuels.
Once a commercial request is received, the operations team will conduct what is known as the compatibility study.
The compatibility study typically considers technical, operational, and safety aspects to verify the compatibility between the supplying vessel and the receiving vessel.
The items reviewed include the operating area of the receiving vessel, port evaluation and the prevalent weather.
A mooring analysis is conducted using the well known Optimoor software. The evaluation of adequate thundering and spacing is carried out as well as the reach of the crane, sufficient hose length, the type of coupling used, the manifold arrangement, especially the height of the manifolds. Documents like vessels drawing among others are also exchanged.
Communication protocols, interface and connections between both vessels are also crucial and the compatibility of the emergency shutdown systems and electrical isolations needs to be confirmed.
The receiving vessels should also have nitrogen Pershing capabilities and if vapour return is required, the supplying vessels should be equipped with a compatible vapour return arrangement.
Another item to be determined is the tank pressure of the receiving vessel and the acceptable transfer flow rate. Other administrative aspects are considered too like permits or country specific regulations required at the port.
A port agent is appointed to represent the vessel operators or owners and facilitate the efficient arrival, working and departure of the vessels in the port.
Once all compatibility items are reviewed and agreed upon with the customer, a bunkering plan is established. There is a full set of procedures supported with documents that need to be followed before, during and after bunkering. Those procedures follow pre approved set of checklists for each step of the operation. As you can see, a lot of efforts are spent behind the scenes. Close coordination, careful preparation and effective scheduling are the trademarks of a successful LNG bunkering venture.
I would like to thank again the management of Avenir LNG for organizing this visit and the amazing crew of the Avenir Aspiration for showing me around the vessel and explaining LNG bunkering operations to me.
Thank you for watching this episode and we’ll catch you on the next one.